Mandatory Clean Production Audit Enterprise Information Disclosure Form
According to the Notice of the Zhejiang Provincial Department of Ecology and Environment on the Announcement of the List of Qualified Enterprises for Compulsory Clean Production Audit and Acceptance in Zhejiang Province in 2022 and the Plan List of Enterprises for Compulsory Clean Production Audit in Zhejiang Province in 2023 (Zhe Huan Han [2023] No. 129), our company (Zhejiang Jester Electric Appliance Co., Ltd.) has been listed as a mandatory clean production audit enterprise in Zhejiang Province in 2023. After receiving the relevant documents, the company leadership attached great importance and established an audit team led by the chairman. In March 2023, they proactively contacted Zhejiang David Environmental Planning and Design Co., Ltd. to carry out the mandatory clean production audit in Zhejiang Province for the year 2023.
According to the Measures for the Disclosure of Environmental Information of Enterprises and Institutions, Order No. 31, the relevant information of the enterprise is hereby announced as follows.
Enterprise Name | Zhejiang Jester Electric Appliance Co., Ltd | Legal Representative |
Xu Renxian | |
Enterprise Address | Zone A, Nubu Industrial Park, Lanxi City | |||
Use (discharge) of toxic and harmful raw materials | ||||
Use substance name | Quantity in 2022 (t) | Use to | ||
Electrolytic lead | 10836.7 | Plate making | ||
Lead alloy | 1617.6 | Plate making | ||
Lead calcium positive alloy | 4100.8 | Plate making | ||
Lead calcium negative alloy | 3174.4 | Plate making | ||
PE partition | 4176.0 | Plate making | ||
PP partition | 2292.8 | Plate making | ||
Generation and disposal of hazardous waste | ||||
Generating location | Name | Production in 2022 (t/a) | Hazardous waste code | Disposal direction |
Plate manufacturing | Lead slag | 183.905 | 384-004-31 |
Shuangdeng Tianpeng Metallurgy Jiangsu Co., Ltd Anhui Huabo Renewable Resources Technology Co., Ltd |
Plate manufacturing | Lead mud | 26.06 | 384-004-31 | Anhui Huabo Renewable Resources Technology Co., Ltd |
Plate manufacturing | Waste electrode plate | 19.022 | 384-004-31 | Anhui Huabo Renewable Resources Technology Co., Ltd |
Plate manufacturing | Waste batteries | 0..076 | 900-044-49 | Anhui Huabo Renewable Resources Technology Co., Ltd |
Productive process | Abolish labor protection | 2.952 | 900-041-49 | Anhui Huabo Renewable Resources Technology Co., Ltd |
Housing | Waste oil ink bucket | 0.33 | 900-041-49 | Lanxi Zili Environmental Protection Technology Co., Ltd |
Waste gas treatment measures: | ||||
Lead powder grinding and lead dust: And paste lead dust: Electrode plate brushing lead dust: Assembly of lead smoke/dust 1: Lead smoke and dust from welding and casting: Lead dust from terminal welding: Assembly of Lead Dust 2: Encapsulation of lead dust: Wastewater treatment measures: Lead acid wastewater first enters the regulating tank for water quality and quantity regulation. At the same time, the laundry wastewater treated by sedimentation is discharged into the collection tank. Then, the wastewater is pumped into the secondary pH regulating tank through a lift pump, and the pH is gradually increased to 8-9, forming lead hydroxide precipitate. After pH adjustment, the wastewater enters a one-step purifier for treatment. The principle of a one-step purifier is to first add PAC and PAM coagulants to the wastewater, causing the sediment to condense into large particles, and then separate the sludge and water in the inclined tube sedimentation zone. After precipitation, the wastewater undergoes pH adjustment and then undergoes filtration treatment. After being treated by a one-step purifier, the water is discharged into a clean water tank for reuse or piping. Some of the recycled water is treated with a secondary water reuse reverse osmosis membrane treatment device after the one-step purifier. The treated recycled water can be used for processes that require higher water quality. |
||||
Implementation of environmental risk prevention and control measures in accordance with the law | ||||
Corresponding emergency plans for sudden environmental incidents have been prepared and filed with the local environmental protection department. Within three years, there have been no major or more sudden environmental incidents or significant social impacts caused by environmental pollution problems. |